Okay.... I can't wait any longer. I have to bring this thing back to the present moment. This posting
This whole process is going by so fast I'm having a very difficult time keeping up with it.
Fortunately though we are right on time with the building, even with the heavy rain that showered us the last few days. All the walls are up and covered with plywood sheathing. the roof beams and rafters are up and safely secured with hurricane straps. As I'm typing this Fionnbharre is on top of the roof nailing down the last bit of roof sheathing .
We ordered the roof, windows, and doors this past week and will be ready to install everything within the next week or two.
Framing the Flat roof ( over loft)
| hurricane straps attached to steel beam to insure security and a solid foundation for the roof. |
| Hard work and precision has paid off. |
Framing Peaked Roof
| Don't forget to do your Yoga! One must stay fit and limber when building house. |
Applying Roof Sheathing